SX Kinetics, Inc. has recently been awarded the following contracts:

Stainless Steel SX Plant: SX Kinetics developed a new solvent extraction pilot plant for operation at elevated temperature. The plant was designed for operation up to 150 °C, well above the flash point of the organic phase. A low pressure nitrogen gas system was incorporated into the design to permit a low flow of nitrogen over the vapour space in all mixers, settlers, over flow weirs, and feed tanks.

 

The plant included 6 mixer-settlers that can be configured for any number of extraction stages.

For more details regarding this stainless steel pilot plant please go to: SX Pilot Plant 4

 

Solvent Extraction and Electrowinning Pilot Plant: SX Kinetics was awarded a contract to design and manufacture this SX / EW pilot plant for Iran Mineral Processing Research Center. The solvent extraction plant included 10 stages of mixer-settlers that can be configured for any number of extraction, scrubbing, and stripping stages with either organic or aqueous recycle. The electrowinning plant included 8 cathodes and 9 anodes coupled to a 1000 amp rectifier.

Solvent extraction and electrowinning pilot plant showing 10 stages in the SX circuit and the electrowinning cell with 8 cathodes and 9 anodes with a 1000 amp rectifier.

For more details regarding this project: Portable / Modular SX Plant 5 and EW Pilot Plant 5

 

Leach / SX/ EW Pilot Plant: This leaching / solvent extraction / electrowinning pilot plant was designed and manufactured by SX Kinetics for a research and development test program on various metals including copper, cobalt, nickel and zinc.

Leaching, solvent extraction, and electrowinning pilot plant for laboratory or bench scale test programmes.

For details on this continuous leach pilot plant go to  Leach Pilot Plant 3, for details on this laboratory SX pilot plant go to Laboratory SX Plant 6, and for details on this EW pilot plant please go to EW Pilot Plant 4.

 

SX / EW Pilot Plant: SX Kinetics was awarded a contract for the design and construction of this SX / EW pilot plant for a copper project in Mongolia. The pilot plant included six stages of mixer settlers and an electrowinning cell coupled to a 0 to 50 amp and 0 to 10 volt rectifier.

Solvent extraction and electrowinning pilot plant for laboratory or bench scale test programmes.

For details on this laboratory SX pilot plant go to Laboratory SX Plant 5, and for details on this EW pilot plant please go to EW Pilot Plant 3.

                            

This page was last updated on 08/26/23.

| HOME | SITE MAP | SX PLANTS | EW PLANTS | LEACHING | HYDROMET | COALESCERS | SERVICES | PROJECTS | TECHNOLOGYDOWNLOAD | CONTACT |

39 A Hamilton Avenue, Cobourg, Ontario, Canada, K9A 1V7

© Copyright 2002 -2023  SX Kinetics, Inc. All Rights Reserved                                               email: steven.webster@sxkinetics.com