|
LABORATORY SX PLANTS |
|
|
|
|
|
We provide mini solvent extraction pilot plants for laboratory and bench scale solvent extraction test programs. The following summarizes our laboratory scale solvent extraction pilot plants that we recently manufactured for various clients:
Our Laboratory Solvent Extraction Pilot Plant Features:
| |
For more details: sxk-28 |
Client: Canmine Corporation
Project Number: sxk-28
SX Kinetics designed and manufactured this bench scale pilot plant for a cobalt solvent extraction test program. It was delivered pre-assembled to the client's laboratory. SX Kinetics provided on site technical consulting. |
||
For more details: sxk-31 |
Client: NJIT
Project Number: sxk-31
This bench scale solvent extraction pilot plant was designed and manufactured by SX Kinetics, Inc. and shipped pre -assembled to the New Jersey Institute of Technology. It was used for a research program on the continuous counter- current extraction of proteins. |
||
For more details: sxk-32 |
Client:
Heraeus
Metal Processing, Inc
Project Number: sxk-32
This bench scale solvent extraction pilot plant was designed and manufactured by SX Kinetics, Inc. It was shipped pre -assembled to a research and development laboratory for the solvent extraction of precious metals. |
||
For more details: sxk-36 |
Client: Moscow State Institute of Steel and Alloys (Technological
University)
Project Number: sxk-36
SX Kinetics designed and manufactured this solvent extraction pilot plant for a copper solvent extraction project in Russia. It was used to evaluate various circuit configuration including:
2 extraction and 1 strip stages. 2 extraction and 2 strip stages. 2 extraction, 1 scrub, 1 stripping stages. 2 extraction, 1 scrub, and 2 strip stages. |
||
For more details: sxk-44 |
Client: Erdenet Mining
Corporation
Project Number: sxk-44
SX Kinetics designed and manufactured this solvent extraction pilot plant for a copper solvent extraction project in Mongolia. It included 6 mixer settlers and was coupled to a 60 g per hour electrowinning pilot plant. Details on the electrowinning pilot plant are given at: |
||
For more details: sxk-45 |
Client: Moscow State Institute of Steel and Alloys (Technological
University)
Project Number: sxk-45
SX Kinetics designed and manufactured this laboratory pilot plant that included a continuous leach circuit and a solvent extraction circuit coupled to electrowinning. The laboratory pilot plant included:
4 stages of continuous leaching 14 stages of mixer-settlers in the SX circuit EW pilot plant with 4 cathodes and 5 anodes. |
||
For more details: sxk-53 |
Client: National Iranian Copper Industries Project Number: sxk-53
This laboratory solvent extraction pilot plant was shipped pre -assembled to a research centre in Iran for copper solvent extraction. The solvent extraction pilot plant included 10 mixer-settlers that can be configured for various numbers of extraction, scrubbing, and stripping stages. The plant included metering pumps and an organic reservoir. |
||
For more details: sxk-65 |
Client: Immanuel Technological
Solutions Project Number: sxk-65
This laboratory solvent extraction and electrowinning pilot plant was designed and manufactured by SX Kinetics for a project to recover zinc from EAF (electric arc furnace) dust. |
||
For more details: sxk-74 |
Client: Norilsk Nickel Harjavalta
Oy Project Number: sxk-74
This laboratory solvent extraction pilot plant was shipped pre -assembled to a cobalt refinery in Finland for a cobalt solvent extraction. The solvent extraction pilot plant included 15 mixer-settlers that can be configured for various numbers of extraction, scrubbing, and stripping stages. The plant included metering pumps and 15 immersion heaters. |
||
For more details: sxk-75 |
Client: ZeaChem Inc. Project Number: sxk-75
SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant for the purification of acetic acid by new proprietary technology. The laboratory plant featured flanged mixer-settlers with flanged covers in order to provide an air tight seal for use with solvents having a low flash point. |
||
For more details: sxk-77 |
Client: Gulf Chemical &
Metallurgical Corp. Project Number: sxk-77
This laboratory pilot plant was shipped to a uranium mining plant for a test program aimed at the extraction of uranium from phosphoric acid solutions. |
||
For more details: sxk-79 |
Client: PCS Phosphate Project Number: sxk-79
This laboratory solvent extraction pilot plant featured flanged mixer-settlers with flanged covers in order to provide an air tight seal for use with a solvent at a low flash point. The settlers and organic vessel featured glass jackets for circulation of hot water for operation at elevated temperatures. The pilot plant was used to evaluate the extraction of impurities from phosphoric acid. |
||
For more details: sxk-81 |
Client: Hellenic Copper Mines
Limited Project Number: sxk-81
SX Kinetics designed and manufactured this laboratory solvent extraction pilot for a copper mining company in Cyprus. The plant included 10 stages that can be configured for either organic or aqueous recycle. |
||
For more details: sxk-86 |
Client: Biomed International
Medical & Scientific Supplies Project Number: sxk-86
SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant with pH controllers for a research project in Kuwait. |
||
For more details: sxk-97 |
Client: Areva Resources Canada Inc. Project Number: sxk-97
SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant with pH controllers for a test program to evaluate various uranium stripping parameters. |
||
For more details: sxk-117 |
Client: Neomet Technologies Inc. Location: Quebec, Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-117 SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant for cobalt solvent extraction. The pilot plant was shipped to a research centre in near Montreal, Quebec, Canada.
|
||
For more details: sxk-122 |
Client: Metric Venture Partners Inc. Location: Texas, USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-122
SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant for cobalt solvent extraction. The pilot plant was shipped to a research centre in near Texas, USA. |
||
For more details: sxk-123 |
Client: Kemetco Research Inc. Location: Richmond, BC, Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-123 SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant for a research centre in British Columbia, Canada. |
||
For more details: sxk-134 |
Client: Areva France Location: Niger, Africa Capacity: 400 mL/min (org + Aq) Project Number: sxk-134
SX Kinetics manufactured a solvent extraction pilot plant for a uranium SX project in Niger. |
||
For more details: sxk-135 |
Client: Stellenbosch University Location: South Africa Capacity: 150 mL/min (org + Aq) Project Number: sxk-135
SX Kinetics manufactured this solvent extraction pilot plant for a university in South Africa. |
||
For more details: sxk-143 |
Client: Talvivaara Sotkamo Oy Location: Finland Capacity: 150 mL/min (org + Aq) Project Number: sxk-143
SX Kinetics manufactured this solvent extraction pilot plant for a research centre in Finland. |
||
For more details: sxk-150 |
Client: Outotec Finland Oy Location: Finland Capacity: 150 mL/min (org + Aq) Project Number: sxk-150
SX Kinetics manufactured this solvent extraction pilot plant for a research centre in Finland. |
||
For more details: sxk-152 |
Client: Cytec Industries Inc. Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-152
SX Kinetics manufactured this solvent extraction pilot plant for Cytecs research centre in the USA. |
||
For more details: sxk-157 |
Client: Central Ostrobothnia University Location: Finland Capacity: 150 mL/min (org + Aq) Project Number: sxk-157
SX Kinetics manufactured this solvent extraction pilot plant for a University in Finland. |
||
For more details: sxk-158 |
Client: Equilab Chile Location: Chile Capacity: 150 mL/min (org + Aq) Project Number: sxk-158
SX Kinetics manufactured this laboratory solvent extraction pilot plant for a copper SX project in Chile. |
||
For more details: sxk-165 |
Client: Cytec Industries Inc. Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-165 SX Kinetics manufactured this solvent extraction pilot plant for Cytecs research centre in the USA. |
||
For more details: sxk-169 |
Client: LLC Systems Location: Russia Capacity: 150 mL/min (org + Aq) Project Number: sxk-169 SX Kinetics manufactured this solvent extraction pilot plant for a research centre in the Russia. |
||
|
|
||
For more details: sxk-174 |
Client: Global Tungsten and Powders Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-174 SX Kinetics manufactured this solvent extraction pilot plant with 15 mixer-settler stages. pH controllers were provided on 10 stages. |
||
For more details: sxk-176 |
Client: Sales de Jujuy, S.A. Location: Argentina Capacity: 150 mL/min (org + Aq) Project Number: sxk-176 SX Kinetics manufactured this solvent extraction pilot plant for a research centre in the Argentina.
|
||
For more details: sxk-178 |
Client: VTT Technical Research Centre of Finland Location: Finland Capacity: 150 mL/min (org + Aq) Project Number: sxk-178 SX Kinetics manufactured this solvent extraction pilot plant for a research centre in the Finland.
|
||
For more details: sxk-180 |
Client: Innovation Metals and Technology Metals Research Location: Canada / USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-180
SX Kinetics manufactured this solvent extraction pilot plant for the separation and purification of rare earth metals.
|
||
For more details: sxk-197
|
Client: Siemens Energy Inc Location: WI, USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-197
SX Kinetics manufactured this solvent extraction pilot plant with one extraction stage and one strip stage. A pH controller was provided for the extraction stage.
|
||
For more details: sxk-199
|
Client: Innovation Metals and Technology Metals Research Location: Canada / USA Capacity: 2 L/min (org + Aq) Project Number: sxk-199 SX Kinetics manufactured this solvent extraction column for the separation and purification of rare earth metals. |
||
For more details: sxk-202 |
Client: Paragon International Trading Location: Pakistan Capacity: 150 mL/min (org + Aq) Project Number: sxk-202
SX Kinetics manufactured this solvent extraction pilot plant for a research centre in Pakistan. |
||
For more details: sxk-205 |
Client: Global Tungsten and Powders Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-205
SX Kinetics manufactured this solvent extraction pilot plant with 16 mixer-settler stages.
|
||
For more details: sxk-206 |
Client: Private Citizen Location: Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-206
SX Kinetics manufactured this solvent extraction pilot plant with 18 mixer-settler stages for a research project to recover cobalt from recycled batteries.
|
||
For more details: sxk-210 |
Client: Paul Scherrer Institute Location: Switzerland Capacity: 150 mL/min (org + Aq) Project Number: sxk-210
SX Kinetics manufactured this solvent extraction pilot plant with 8 mixer-settler stages for a research project at a University in Switzerland.
|
||
For more details: sxk-217 |
Client: University of Kentucky Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-217
SX Kinetics manufactured this solvent extraction pilot plant with 6 mixer-settler stages for a research project to recover rare earth metals from coal.
|
||
For more details: sxk-219 |
Client: West Virginia University Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-219
SX Kinetics manufactured this solvent extraction pilot plant with 100 mixer-settler stages for a research project to recover rare earth metals from coal.
|
||
For more details: sxk-222 |
Client: West Virginia University Location: Poland Capacity: 150 mL/min (org + Aq) Project Number: sxk-222
SX Kinetics manufactured this solvent extraction pilot plant with 7 mixer-settlers and 6 pH controllers for a research laboratory in Poland.
|
||
For more details: sxk-226 |
Client: Graidco BV / Ministry of Minerals and Mines Location: Poland / Zambia Capacity: 150 mL/min (org + Aq) Project Number: sxk-226
SX Kinetics manufactured this solvent extraction and electrowinning pilot plant for a copper project in Zambia.
|
||
For more details: sxk-230 |
Client: Pöyry Finland Oy Location: Finland Capacity: 150 mL/min (org + Aq) Project Number: sxk-230
SX Kinetics manufactured this solvent extraction pilot plant with 6 mixer-settlers for a research centre in Finland.
|
||
For more details: sxk-231 |
Client: KU Leuven University of Leuven Location: Belgium Capacity: 150 mL/min (org + Aq) Project Number: sxk-231
SX Kinetics manufactured this solvent extraction pilot plant with 20 mixer-settlers for a cobalt solvent extraction. |
||
For more details: sxk-236 |
Client: Virginia Tech Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-236
Built this laboratory solvent extraction pilot plant with 12 mixer-settlers. The pilot plant included 6 pH controllers. |
||
For more details: sxk-241 |
Client: Outotech Location: Chile Capacity: 150 mL/min (org + Aq) Project Number: sxk-241
This solvent extraction pilot plant has 10 mixer-settlers with 5 pH controllers. The pH controllers can be relocated to any mixer-settler. It was shipped to Outotech's research centre in Chile. |
||
For more details: sxk-243 |
Client: HDR Engineering Inc. Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-243SX Kinetics built this solvent extraction pilot plant with 4 mixer-settlers for a copper SX-EW research project. |
||
For more details: sxk-247 |
Client: Nagrom Location: Australia Capacity: 150 mL/min (org + Aq) Project Number: sxk-247
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers and 5 pH controllers for a laboratory in Australia.
|
||
For more details: sxk-249 |
Client: ASAP Ingenieria Limitada Location: Chile Capacity: 150 mL/min (org + Aq) Project Number: sxk-249
SX Kinetics manufactured this solvent extraction pilot plant with 4 mixer-settlers for a copper project in Chile.
|
||
For more details: sxk-250 |
Client: Inter Reliance Logistics, LLC Location: Mongolia Capacity: 150 mL/min (org + Aq) Project Number: sxk-250
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers for a solvent extraction project in Mongolia.
|
||
For more details: sxk-252 |
Client: Falconbridge Dominicana, S.A. Location: Dominican Republic Capacity: 150 mL/min (org + Aq) Project Number: sxk-252
SX Kinetics manufactured this solvent extraction pilot plant with 10 mixer-settlers for a cobalt solvent extraction project in Dominican Republic.
|
||
For more details: sxk-255 |
Client: Corem Location: Quebec, Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-255
SX Kinetics manufactured this solvent extraction pilot plant with 18 mixer-settlers and 6 pH controllers for a cobalt solvent extraction project. The pH controllers can be relocated to any stage.
|
||
For more details: sxk-258 |
Client: Seren Technologies Location: Belfast, Northern Ireland Capacity: 150 mL/min (org + Aq) Project Number: sxk-258
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers and 5 pH controllers for a research centre at a school of Chemistry and Chemical Engineering.
|
||
For more details: sxk-263 |
Client: Primex International Location: Johannesburg, South Africa Capacity: 150 mL/min (org + Aq) Project Number: sxk-263
SX Kinetics manufactured this solvent extraction pilot plant with 10 mixer-settlers for a research centre in South Africa.
|
||
For more details: sxk-264 |
Client: RSR Technologies Location: Dallas, TX, USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-264
SX Kinetics manufactured this solvent extraction pilot plant with 24 mixer-settlers and 12 pH controllers. The pH controllers can be relocated to any stage.
|
||
For more details: sxk-266 |
Client: Aqua Metals Reno, Inc. Location: Sparks, NV, USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-266
SX Kinetics manufactured this solvent extraction pilot plant with 6 mixer-settlers, 6 pH controllers and 4 pumps.
|
||
For more details: sxk-270 |
Client: Energy Exploration Technologies, Inc. Location: Austin, TX, USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-270
SX Kinetics manufactured this solvent extraction pilot plant with 8 mixer-settlers.
|
||
For more details: sxk-271 |
Client: Prairie Lithium Location: Emerald Park, SK, Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-271
SX Kinetics manufactured this solvent extraction pilot plant for a lithium SX project with 6 mixer-settlers, 6 pH controllers and 4 pumps.
|
||
For more details: sxk-273 |
Client: Seren Technologies Location: Belfast, Northern Ireland Capacity: 150 mL/min (org + Aq) Project Number: sxk-273
SX Kinetics manufactured this solvent extraction pilot plant with 10 mixer-settlers for a research centre at a school of Chemistry and Chemical Engineering.
|
||
For more details: sxk-274 |
Client: Solvey - USA / Cytec - Australia Location: BHP Olympic Dam, South Australia Capacity: 150 mL/min (org + Aq) Project Number: sxk-274
SX Kinetics manufactured this solvent extraction pilot plant with 6 mixer-settlers for a project at BHP Olympic Dam in South Australia.
|
||
For more details: sxk-276 |
Client: Arxo Metals / North-West University Location: South Africa Capacity: 150 mL/min (org + Aq) Project Number: sxk-276
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers and 4 peristaltic metering pumps for a research project in South Africa.
|
||
For more details: sxk-277 |
Client: SCW Systems / Clean Energy Technology Location: The Netherlands Capacity: 150 mL/min (org + Aq) Project Number: sxk-277
SX Kinetics manufactured this solvent extraction pilot plant 5 mixer-settlers, 3 pH controllers and 3 pumps.
|
||
For more details: sxk-278 |
Client: Haifa Negev Technologies Ltd Location: Israel Capacity: 150 mL/min (org + Aq) Project Number: sxk-278
SX Kinetics manufactured this solvent extraction pilot plant with 10 mixer-settlers and 4 peristaltic metering pumps for a research project in Israel.
|
||
For more details: sxk-280 |
Client: Curtin University Location: Australia Capacity: 150 mL/min (org + Aq) Project Number: sxk-280
SX Kinetics manufactured this solvent extraction pilot plant with 12 mixer-settlers, 6 pH controllers and 4 peristaltic metering pumps for a University in Australia.
|
||
For more details: sxk-281 |
Client: Ascend Elements, Inc Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-281
SX Kinetics manufactured this solvent extraction pilot plant with 24 mixer-settlers, 12 pH controllers and 6 peristaltic metering pumps for a company in the US.
|
||
For more details: sxk-286 |
Client: Norscope / Rexys. SA Location: Argentina Capacity: 150 mL/min (org + Aq) Project Number: sxk-286
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers and 3 peristaltic metering pumps for a company in Argentina.
|
||
For more details: sxk-288 |
Client: Arxo Metals / Salene Manganese Location: South Africa Capacity: 150 mL/min (org + Aq) Project Number: sxk-288
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers and 4 peristaltic metering pumps for a research project in South Africa.
|
||
For more details: sxk-289 |
Client: Confidencial Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-289
SX Kinetics manufactured this solvent extraction pilot plant with 20 mixer-settlers and 6 peristaltic metering pumps for the development of rare earth solvent extraction. |
||
For more details: sxk-290 |
Client: Process Research Ortech Location: Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-290
SX Kinetics manufactured this solvent extraction pilot plant with 5 mixer-settlers, 3 pH controllers and 3 peristaltic metering pumps. The pilot plant will be shipped to South Korea after several months of testing at Process Research Ortech.
|
||
For more details: sxk-289A |
Client: Confidencial Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-289A
SX Kinetics manufactured this solvent extraction pilot plant with 40 mixer-settlers rare earth research. |
||
For more details: sxk-289B |
Client: Confidencial Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-289B
SX Kinetics manufactured this solvent extraction pilot plant with 32 mixer-settlers for rare earth research. |
||
For more details: sxk-289C |
Client:Confidencial Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-289C
SX Kinetics manufactured this solvent extraction pilot plant with 28 mixer-settlers for rare earth research. |
||
For more details: sxk-293 |
Client: Albemarle Lithium, Inc. Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-293
SX Kinetics manufactured this solvent extraction pilot plant with 8 mixer-settlers, 4 pH controllers and 4 pumps. This pilot plant is for lithium.
|
||
For more details: sxk-296 |
Client: CanMet, Government of Canada Location: Ottawa, ON, Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-296 SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant for the government of Canada's research centre in Ottawa, Canada.
|
||
For more details: sxk-298 |
Client: Altilium Metals Ltd. Location: Tavistock, Devon, UK Capacity: 150 mL/min (org + Aq) Project Number: sxk-298 SX Kinetics designed and manufactured this laboratory solvent extraction pilot plant for research aimed at removing and recycle carbon from the electrical vehicle supply chain.
|
||
For more details: sxk-301 |
Client: Missouri Cobalt Location: USA Capacity: 150 mL/min (org + Aq) Project Number: sxk-301 SX Kinetics manufactured this laboratory solvent extraction pilot plant with 20 stages for cobalt solvent extraction pilot plant testing.
|
||
For more details: sxk-302 |
Client: Queens University Location: Kingston, ON, Canada Capacity: 150 mL/min (org + Aq) Project Number: sxk-302 SX Kinetics manufactured this laboratory solvent extraction pilot plant with 5 mixer-settler stages, 3 pH controllers and 3 peristaltic metering pumps. |
||
|
| HOME | SITE MAP | SX PLANTS | EW PLANTS | LEACHING | HYDROMET | COALESCERS | SERVICES | PROJECTS | TECHNOLOGY | DOWNLOAD | CONTACT |
This page was last updated on 10/10/24
39A Hamilton Avenue, Cobourg, Ontario, Canada, K9A 1V7
© Copyright 2002 -2024 SX Kinetics, Inc. All Rights Reserved email: steven.webster@sxkinetics.com